It's been a long time since I wrote about our Lake house works - it's been a busy period and still is. Progress is slow, the two upstairs floors are still a complete mess, but it's at least getting to the point where the ground floor is beginning to function - the kitchen is almost there, the sitting room - apart from the floor which I still hope to restore despite of all my builders' advice to rip it up and replace, as it is really in very poor condition - is feeling quite cosy,
even with its provisional old bits of furniture, and, joy of joys, the bathroom is warm and we don't have to use the outside loo any more :-) There still a lot of decorating to be done and much detail to be tidied up, but after all the months of rubble and mess, it's lovely to be able to make tea and wash up and curl up and feel that the house is beginning to feel like a house at last.... even if the outside still looks so terribly sorry for itself - poor old house!
Well, now the roof covering is off - of course as Fate would have it, the weather turned nasty just as the joiners arrived to work on replacing rotten timbers etc, and raising one of the gable ends. Water is getting into the house despite the plastic covering sheets... now it's even starting to snow, so I need lots of crossed fingers to see us through this moment.
Wednesday, 14 October 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment