Sorry about the huge delay in informing you all about the progress on the Forest house. As you can see the facade is complete (save for a final coat of paint) and new windows have been fitted, leaving the front door and two more windows to be done. Many repairs have been carried out inside, including repair to the original ceilings that, thank goodness, didn't fall down after all the various disasters with the roof etc. The mains electrics have all been changed - new trench for upgraded feeder cables, new meter and board etc. The rendering around windows still needs to be finished, and wooden ledges installed. The furniture is still temporary, what's left over from the previous owners, but cozy enough for the time being. As you can also see, the roof unfortunately still isn't complete (lack of money) so it'll have to wait till the Spring or Summer. But now it has all been prepared and covered with sheeting for the Winter - by myself as I didn't trust the roofers. Well that's that for the time being, no more building work till the Spring. But I hope to let you know how the house is feeling at around Christmas time as I should be spending some time there.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment